首页> 外国专利> METHOD FOR MINE TUNNEL EXCAVATION WITHOUT CUT ROCK REMOVAL TO DAY SURFACE

METHOD FOR MINE TUNNEL EXCAVATION WITHOUT CUT ROCK REMOVAL TO DAY SURFACE

机译:不开挖将岩石挖到白天的矿山隧道开挖方法

摘要

FIELD: tunnel construction, particularly devices to construct hydroelectric power plant floodgates and to build motor roads and rail roads in mountains.;SUBSTANCE: method involves creating conditions favorable for chemical reaction between chemical element oxides basically constituting rock and graphite for rock fusion. For this rock is heated up to high temperature at face by thermal electric arc energy transmission through metal front tunneling machine wall. Electric arc is generated between electrodes inside discharge chambers arranged on inner surface of front tunneling machine wall. Electric current is supplied to electrodes via graphite mass moving through electrically-insulated pipes. Graphite is forced via electrodes and introduced into face through nozzles connected to front tunneling machine wall.;EFFECT: possibility to regulate electric current power and graphite mass to select necessary excavation regimes.
机译:领域:隧道建设,特别是用于建造水力发电站闸门以及在山区建造机动车道和铁路的装置。物质:该方法涉及创造有利于基本构成岩石的化学元素氧化物与用于熔融岩石的石墨之间的化学反应的条件。为此,通过热电弧能量通过金属前部掘进机壁将岩石加热至高温。在隧道掘进机前壁内表面上的放电室内部的电极之间会产生电弧。电流通过在电绝缘管中移动的石墨块提供给电极。石墨通过电极被压入,并通过与掘进机前壁相连的喷嘴被引入到工作面。效果:可以调节电流功率和石墨质量以选择必要的开挖方案。

著录项

  • 公开/公告号RU2319836C1

    专利类型

  • 公开/公告日2008-03-20

    原文格式PDF

  • 申请/专利权人 KUZNETSOV GENNADIJ PETROVICH;

    申请/专利号RU20060133461

  • 发明设计人 KUZNETSOV GENNADIJ PETROVICH;

    申请日2005-04-11

  • 分类号E21D9/06;E21C37/18;

  • 国家 RU

  • 入库时间 2022-08-21 19:50:46

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号