METHOD FOR BLAST-FURNACE MELTING OF ZINC-CONTAINING BURDEN

机译:含锌炉料的高炉熔炼方法

摘要

FIELD: ferrous metallurgy, in particular, process for blast-furnace melting of zinc-containing burden.;SUBSTANCE: method involves removing zinc from furnace working space by forming buffer layer having predetermined height through charging of coke and crushed slag and periodically lowering burden charge level; forming buffer layer from individual coke layer and crushed slag layer of fractions, respectively, (25-150):(40-150) mm, with weight ratio of components, respectively, (20-60):(150-300) kg/m3 of blast furnace; elevating temperature of blast furnace gas to 420-750 C, said process being carried out in 25-35 days; feeding blast-furnace gas cleaner sledges into separate sledge collector and providing natural settling of sledge during at least 3 days; pumping pulp of settled sledge; dehydrating and unloading dried sledge for zinc production.;EFFECT: reduced periodicity in repairing of blast furnace, reduced consumption of coke, and increased efficiency of blast furnace.
机译:领域:黑色冶金,特别是高炉熔炼含锌矿渣的方法。物质:该方法涉及通过装入焦炭和碎渣形成具有预定高度的缓冲层并定期降低矿渣的装料,从炉子工作空间中除去锌。水平;由各个部分的焦炭层和碎渣层分别形成(25-150):( 40-150)mm的缓冲层,各组分的重量比分别为(20-60):( 150-300)kg / m 3 高炉;将高炉煤气的温度升高到420-750℃,所述过程在25-35天内进行;将高炉煤气清洁器的雪橇喂入独立的雪橇收集器中,并在至少3天的时间内自然沉降雪橇;抽出沉淀的雪橇浆;脱水和卸载干燥的八角铁用于生产锌。效果:缩短了高炉的维修周期,减少了焦炭的消耗,提高了高炉的效率。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号