首页> 外国专利> METHOD FOR BOTTOMHOLE TREATMENT OF OIL PRODUCING WELLS AND DEVICE TO IMPLEMENT SUCH METHOD

METHOD FOR BOTTOMHOLE TREATMENT OF OIL PRODUCING WELLS AND DEVICE TO IMPLEMENT SUCH METHOD

机译:采油井底孔处理方法及实现该方法的装置

摘要

FIELD: petroleum industry.;SUBSTANCE: invention is referred to petroleum industry, methods and devices to increase well production rate by treating near-wellbore zone of reservoir in order to remove various deposits. Wells shall be identified with bottomhole damaged by solid depositis with maximum current rate 3...5 m3/day. Composition of deposits of the identified well bottomhole shall be determined. Well is shutdown and submersible pumping equipment is run out of hole. Thermal/gas/chemical generator placed in tubular package is run in hole on tubing string to the target interval. Thermal/gas/chemical generator is made of solid particles of hydraulic reactant capable of exoergic reaction with water. Particles of hydraulic reactant are placed in cylindrical capsules (at least in one). Capsules are leak proof and manufactured of decomposable material and installed in the container cavity. Capsules with hydraulic reactant particles are filled with liquid chemical reactionless with hydraulic reactant but dissolving bottomhole deposits. Container is provided with radial windows at the envelope and contains capsule opening system arranged in the bottom part of the container. Capsule opening system is made as a piston mounted under the bottom capsule and rod with top part connected to the piston and low part to liner via axial channel in the bottom section of the container. The rod length is equal to the container length, with liner length equal to the distance from target interval to well bottomhole. Tubing string is leak proof and filled with air and provided with controlled valve in the bottom part with inlets to tubing string cavity and wellbore. Generator is started up and operated by communication with produced water. Generator shall be placed in top part of the target interval. Overbalance during thermal/gas/chemical stimulation is created by increase in well fluid level by installing of air chamber below the level simultaneously with thermal/gas generator.Volume of air chamber shall constitute minimum 25% of well fluid volume. Maximum time between pump shutdown and air chamber installation below the fluid level is 2 days. Well fluid level after air chamber installation is 5...15% higher than the static fluid level. Generator is started and thermal/gas/chemical treatment with simultaneous overbalance of the formation is performed in order to stimulate the formation. Underbalance treatment and stimulation of the formation are performed by decreasing well fluid level by decompression of the air chamber. Well shall be flushed to remove by-products of formation treatment. Submersible pump is run in hole and commissioned.;EFFECT: higher geological efficiency of well treatment, processability and engineering safety of well intervention activities.;2 cl, 4 dwg
机译:领域:本发明涉及石油工业,通过处理储层的近井眼区域以去除各种沉积物来提高井生产率的方法和装置。应当确定井眼是否有被固态沉积物破坏的井底,最大流速为3 ... 5 m 3 /天。确定已确定井底孔的沉积物的组成。井正在关闭,潜水泵设备井出了孔。放置在管状包装中的热/气体/化学发生器在油管柱上的孔中运行至目标间隔。热/气/化学发生器由能够与水发生热反应的水硬性反应物的固体颗粒制成。将水硬性反应物的颗粒置于圆柱形胶囊中(至少合一)。胶囊是防漏的,由可分解材料制成并安装在容器腔中。具有水硬性反应物颗粒的胶囊填充有液体化学物质,与水硬性反应物无反应,但溶解了井底沉积物。容器在封壳处设有径向窗口,并包含布置在容器底部的胶囊打开系统。胶囊打开系统由安装在底部胶囊和活塞杆下方的活塞组成,其顶部与活塞连接,下部通过容器底部的轴向通道与衬管连接。杆的长度等于容器的长度,衬管的长度等于从目标间距到井底孔的距离。油管柱是防漏的,充满空气,并且在底部设有可控阀,并带有油管柱腔和井眼的入口。发电机通过与采出水连通启动并运行。发电机应放置在目标间隔的顶部。热/气/化学增产过程中的过平衡是通过在热/气发生器同时安装低于水平的气室来增加井中的液位而引起的。气室的体积应至少占井中液量的25%。泵停机到低于液位的气室安装之间的最长时间为2天。气室安装后的井液位比静态液位高5 ... 15%。启动发生器,并进行热/气/化学处理,同时平衡地层,以刺激地层。欠平衡处理和地层增产是通过气室减压来降低井液水平来进行的。井应冲洗以除去地层处理的副产物。潜水泵在井中运行并调试。效果:井处理的地质效率更高,井作业的可加工性和工程安全性更高; 2 cl,4 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号