首页> 外国专利> LABOR SAVING METHOD FOR CORE MATERIAL IN SOIL CEMENT COLUMN ROW WALL

LABOR SAVING METHOD FOR CORE MATERIAL IN SOIL CEMENT COLUMN ROW WALL

机译:土壤水泥柱行墙内核心材料的节省劳动力的方法

摘要

PROBLEM TO BE SOLVED: To provide a labor saving method for a core material in a soil cement column row wall reducing a construction cost by reducing stress bearing members used while maintaining required strength in constructing the soil cement column row wall.;SOLUTION: The length and arrangement spaces of the stress bearing members 4 used in constructing the soil cement column row wall 1a are set based on stress in the depth position of the soil cement column row wall 1a and strength property of soil cement, and the stress bearing members 4 are formed as stress bearing members 4 deep in penetration depth below the excavation bottom and stress bearing members 4 with the upper ends lowered from the ground surface, or stress bearing members 4 shallow in penetration depth and stress bearing members 4 shallow in penetration depth, with the upper ends lowered from the ground surface. These stress bearing members 4 are installed intermingled over the whole periphery of the soil cement column row wall.;COPYRIGHT: (C)2009,JPO&INPIT
机译:要解决的问题:提供一种省力的方法,用于减少水泥水泥柱排墙中的芯材,通过减少所用的承压构件,同时保持构造水泥水泥柱排墙的强度来降低建筑成本。解决方案:长度基于土壤水泥柱行壁1a的深度位置处的应力和土壤水泥的强度特性,设定用于建造土壤水泥柱行壁1a的应力承受构件4的布置和布置空间,并且应力承受构件4为形成为在挖掘底部下方的穿透深度较深的应力承载构件4和上端部从地面下降的应力承载构件4,或者穿透深度浅的应力承载构件4和穿透深度浅的应力承载构件4,上端从地面下降。这些应力承受元件4混合安装在水泥土柱排墙的整个周边。版权所有:(C)2009,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号