首页> 外国专利> OVERHANGING CONSTRUCTION METHOD AND OVERHANGING CONSTRUCTION STRUCTURE FOR BRIDGE

OVERHANGING CONSTRUCTION METHOD AND OVERHANGING CONSTRUCTION STRUCTURE FOR BRIDGE

机译:桥梁悬空施工方法及悬空施工结构

摘要

PROBLEM TO BE SOLVED: To provide an overhanging construction method and an overhanging construction structure for a bridge in which the tension of the bridge does not exceed the tensile limit of an installed rubber shoe even when the overhang length of the bridge is large or a cable is not allowed to use.;SOLUTION: When the bridge 5 is constructed while overhanging between abutments 2, 3 or piers 4, a temporary rubber shoe 8 with a coefficient of compression spring smaller than the coefficient of compression spring of the installed rubber shoe 7 is preliminarily installed on the upper part of the installed rubber shoe 7 installed on the upper part of the abutments 2, 3 or the piers 4. The bridge 5 is constructed while overhanging with the bridge 5 supported on the temporarily installed rubber shoe 8. The temporarily installed rubber shoe 8 is removed by jacking up the bridge 5, and the bridge 5 is installed on the installed rubber shoe 7 by jacking down.;COPYRIGHT: (C)2009,JPO&INPIT
机译:要解决的问题:提供一种桥梁的悬垂施工方法和悬垂施工结构,即使桥梁的悬垂长度很大或电缆,桥梁的张力也不会超过已安装的橡胶靴的拉伸极限。解决方案:当桥5悬在桥台2、3或桥墩4之间时,桥架5的临时橡胶靴8的压缩弹簧系数小于已安装的橡胶靴7的压缩弹簧系数。桥梁5被预先安装在安装的橡胶靴7的上部,橡胶靴7安装在桥台2、3或墩4的上部。桥5在悬垂的同时桥5支撑在临时安装的橡胶靴8上。通过顶起桥架5来卸下临时安装的橡胶靴8,并通过顶起将桥架5安装在已安装的橡胶靴7上。版权所有:(C)2009,JPO&INPIT

著录项

  • 公开/公告号JP2009167616A

    专利类型

  • 公开/公告日2009-07-30

    原文格式PDF

  • 申请/专利权人 IHI CORP;

    申请/专利号JP20080004361

  • 发明设计人 YABUNO MASASHI;KADOYA JIN;

    申请日2008-01-11

  • 分类号E01D21/10;

  • 国家 JP

  • 入库时间 2022-08-21 19:44:33

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号