CONSTRUCTION METHOD FOR COFFERDAM WALL USING STEEL SEGMENT

机译:钢段围堰的施工方法

摘要

PROBLEM TO BE SOLVED: To suppress an increase in a construction period and costs, which are required for a cofferdam construction method.;SOLUTION: A bearing pile 24 is installed on the outside of a place for installing the cofferdam wall 10, and a hanging girder 26 is formed on the bearing pile 24. A steel segment 14 for forming a ring corresponding to one step is suspended on the hanging girder 26, and the steel segments 24 are annularly connected together on the surface of water so as to form the ring 16. The plurality of rings (16A-16D) are stacked on the surface of the water while the ring 16 is suspended, and the cofferdam wall 10 is elongated downward, so that connecting operations and cut-off operations can be facilitated. Since the cofferdam wall 10 is conveyed in the unit of the steel segment 14 to the place for installing the cofferdam wall 10, conveying operations in this case can be easily performed. A load is applied in the direction of pushing down the uppermost ring from the hanging girder 26, in the state of making the lowermost ring 16A abut on a foundation 20 on the bottom of the water. Thus, a section between the cofferdam wall 10 and the bottom of the water can be more surely sealed.;COPYRIGHT: (C)2009,JPO&INPIT
机译:解决的问题:为了抑制建造围堰的方法所需的建造时间和成本的增加。解决方案:在建造围堰壁10的地方的外侧安装了一个承重桩24,并悬挂了在承重桩24上形成梁26。在悬梁26上悬挂有用于形成与一个台阶对应的环的钢制部段14,钢制部段24在水面上环状地连接在一起而形成环。 16.在悬挂环16的同时,多个环(16A-16D)堆叠在水的表面上,并且围堰壁10向下拉长,从而可以促进连接操作和切断操作。由于围堰壁10以钢段14为单位被运送到安装围堰壁10的场所,因此,在这种情况下的运送操作容易进行。在使最下环16A抵接在​​水底的地基20上的状态下,沿从吊梁26向下推最上环的方向施加载荷。因此,围堰壁10和水的底部之间的部分可以更可靠地密封。;版权所有:(C)2009,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号