首页> 外国专利> The hole doing the hole

The hole doing the hole

机译:孔做洞

摘要

PROBLEM TO BE SOLVED: To provide a corrosion estimating method of a steel material capable of measuring/evaluating the corrosion of the steel material with high precision without excessively damaging existing concrete.;SOLUTION: A core 6 is sampled by boring a existing structure 1 in which the steel material is embedded to form a boring hole 5. Next, the core 6 is observed not only to determine the installation positions of monitoring test specimens 7 but also to measure the amount of the chloride of the core 6. Then, the monitoring test specimens 7, each of which is formed by coating a divided reinforcing rod 23 having a concrete resistance sensor 27, a reference electrode, a counter electrode 29, a temperature sensor 31 and a current measuring lead wire 13 arranged thereto is coated with porous concrete 21, are installed in the boring hole 5 and parts where no monitoring test specimens 7 are installed are filled with unshrinkable mortar 9. Thereafter, the monitoring test specimens 7 are used to acquire data related to predetermined items. Further, the amount of the chloride obtained by analyzing the core 6 and the data acquired by monitoring are used to estimate the corrosion speed of the steel material in the existing structure 1.;COPYRIGHT: (C)2006,JPO&NCIPI
机译:解决的问题:提供一种能够以高精度测量/评估钢材的腐蚀而又不过度破坏现有混凝土的钢材的腐蚀估算方法;解决方案:通过在现有结构1中钻孔来对铁心6进行采样埋入钢材以形成钻孔5。接下来,观察芯子6,不仅确定监测试样7的安装位置,而且测量芯子6的氯化物含量。然后,进行监测试样7,是通过在多孔质混凝土上涂布由混凝土电阻传感器27,参比电极,对电极29,温度传感器31以及配置于其上的电流测量用导线13的分割加强棒23而形成的。如图21所示,将这些试样安装在镗孔5中,并且将未安装监控试样7的部件填充有不可收缩的砂浆9。此后,监控试样7用于获取与预定项目有关的数据。此外,通过分析型芯6获得的氯化物的量和通过监测获得的数据被用于估算现有结构1中钢材的腐蚀速度。版权所有:(C)2006,JPO&NCIPI

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号