PROBLEM TO BE SOLVED: To construct underground containment barrier for hazardous waste which is buried underground without excavating and removing the waste.;SOLUTION: First, a wire saw 75 cuts the section between directive drilled holes with fluid having high density, so as to form a horizontally cut-off part under a embedded groove. Secondly, a vertical surrounding groove 76 is excavated. Next, the surrounding groove 76 is filled with grout having high density. Then, a block of soil 78 is floated, and moves upward to its final location having an edge of the higher soil arranged outside. Finally, an airtight cap structure 81 is connected to the soil barrier underneath.;COPYRIGHT: (C)2009,JPO&INPIT
展开▼