首页> 外国专利> While the hole doing with soil improvement body

While the hole doing with soil improvement body

机译:而孔做土壤改良剂

摘要

PROBLEM TO BE SOLVED: To provide a ground improving body forming method the construction period of which is shortened by simultaneously executing insertion of a steel pipe and formation of a ground improving body and which is excellent in economical effect, and a ground improving body forming apparatus.;SOLUTION: The ground improving body forming method comprises the steps of simultaneously advancing a pipe 6 having a pipe bit 5 provided at the tip end and a hardening material jetting rod 4 piercing the pipe 6, moving only the rod 4 backward by a specified distance after completion of boring to align hardening material jetting holes and sludge suction holes of both the pipe 6 and the rod 4 to one another, moving the pipe 6 and the rod 4 backward with jetting the hardening material into the ground and discharging the sludge for the primary formation, then advancing only the pipe 6 to align the holes of the rod 4 and other hardening material jetting holes of the pipe with the sludge suction hole for the secondary formation and repeating the above described primary formation and secondary formation to form the ground improving body with the pipe inserted. The ground improving body forming apparatus is also disclosed.;COPYRIGHT: (C)2005,JPO&NCIPI
机译:解决问题的方法:提供一种通过同时进行钢管的插入和地面改良体的形成而缩短施工时间,经济性优异的地面改良体形成装置以及地面改良体形成装置。解决方案:地面改善体的形成方法包括以下步骤:同时推进管道6,该管道6的尖端处设有管头5,而硬化材料喷射杆4刺穿该管道6,仅使杆4向后移动指定的距离。镗孔完成后的距离,使管道6和杆4的硬化材料喷射孔和污泥抽吸孔彼此对齐,向后移动管道6和杆4,同时将硬化材料喷射到地面并将污泥排出。在初级地层中,然后仅前进管道6以使杆4的孔和其他硬化材料喷射孔与污泥抽吸口对齐离子孔,用于次要构造,并重复上述主要构造和次要构造,以在插入管道的情况下形成地面改良体。还公开了一种地面改良体形成设备。;版权所有:(C)2005,JPO&NCIPI

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号