[Object] Even when multiple work processes depending on one another progress in parallel, it is possible to appropriately manage the progress of the whole work that includes these work processes.;[Solution] A work management system for managing the progress of work is provided with a process recording section which records, in association with at least one of multiple work processes, previous processes which are other work processes providing a product for the work process; and a reference maturity degree recording section which records, for each of the previous processes associated with one work process recorded in the process recording section, a reference maturity degree which is the maturity degree of the product of the previous process required to start the one work process. For each of the previous processes recorded in the process recording section in association with one work process, the maturity degree of the product of the previous process is acquired. On condition that, for every previous process recorded in the process recording section in association with one work process, the maturity degree for the previous process is equal to or above the reference maturity degree for the previous process, it is notified that one work process can be started.
展开▼