首页> 外国专利> Method for manufacturing with engineering change override

Method for manufacturing with engineering change override

机译:具有工程变更优先权的制造方法

摘要

The illustrative embodiments provide a computer implemented method, apparatus, and computer usable program code for processing orders. A request for delivery by a requested delivery date is received for an order having an original delivery date. The ordered product is broken down into one or more materials required for manufacturing the ordered product. For at least one material required for manufacturing the ordered product, a date when an engineering change becomes effective for the material is specified. An alternate bill of materials is created based on the specified date when the engineering change becomes effective for the material. An alternate manufacturing plan based on the alternate bill of materials is created. Manufacturing is initiated based on the alternate manufacturing plan. If manufacturing can be completed in time for delivery by the requested delivery date, the original delivery date of the order is replaced with the requested delivery date.
机译:说明性实施例提供了一种用于处理订单的计算机实现的方法,装置和计算机可用程序代码。对于具有原始交货日期的订单,将收到在要求的交货日期之前交货的请求。将订购产品分解为制造订购产品所需的一种或多种材料。对于制造订购产品所需的至少一种材料,指定了对该材料进行工程变更生效的日期。当工程变更对物料生效时,将根据指定的日期创建备用物料清单。根据替代物料清单创建替代制造计划。根据替代制造计划开始制造。如果可以在要求的交货日期之前按时完成生产,则将订单的原始交货日期替换为所要求的交货日期。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号