首页> 外国专利> method and system for the design and optimization of drilling in hydrocarbon reservoir, reservoirs and u0437u0430u043au0430u043du0447u0438u0432u0430u043du0438u044f

method and system for the design and optimization of drilling in hydrocarbon reservoir, reservoirs and u0437u0430u043au0430u043du0447u0438u0432u0430u043du0438u044f

机译:油气藏,储层和 u0437 u0430 u043a u0430 u043d u0447 u0438 u0432 u0430 u043d u0438 u044f的钻探设计和优化的方法和系统

摘要

is a way to generate project drilling sitea design of workflow model of geological environment; building the initial model of the geological environment on the basis of u043fu043eu0441u043bu0435u0434u043eu0432u0430u0442 u0435u043bu044cu043du043eu0441u0442u0438 operationsadapted for the modeling of drilling and u0437u0430u043au0430u043du0447u0438u0432u0430u043du0438u044f in u0443u0433u043bu0435u0432u043eu0434u043eu0440u043eu0434u043du043eu043c reservoir is the reservoir calibration model. primary geological environmentu0433u0435u043du0435u0440u0438u0440u0443u044eu0449u0443u044e u043au0430u043bu0438u0431u0440u043eu0432u0430u043du043du0443u044e model of geological environment, and generate the project drilling sites using u043au0430u043bu0438u0431u0440u043eu0432u0430u043du043du043eu0439 model of geological environment.
机译:是一种生成工程钻探场地的方法-一种地质环境工作流模型的设计;根据适用于以下操作的 u043f u043e u0441 u043b u0435 u0434 u0434 u043e u0432 u0430 u0442 u0435 u043b u044c u043d u043d u043e u0441 u0432 u0442和 u0437 u0430 u043a u0430 u043d u0447 u0438 u0432 u0430 u043d u0438 u044f在 u0443 u0433 u043b u0435 u0432 u0432 u043e u043e u0434 u043e u0440 u043e u0434 u043d u043e u043c储层是储层校准模型。主要地质环境 u0433 u0435 u043d u0435 u0440 u0438 u0440 u0443 u044e u0449 u0443 u044e u043a u0430 u043b u0438 u0431 u0440 u04340 u043e u0432 u0430 u0431 u0431 u0440 u043e u0432并使用 u043a u0430 u043b u0438 u0431 u0440 u043e u0432 u0430 u043d u043d u043e u0439地质环境模型生成项目钻探场。

著录项

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号