首页> 外国专利> MULTI-BUILDING CONTROL FOR DEMAND RESPONSE POWER USAGE CONTROL

MULTI-BUILDING CONTROL FOR DEMAND RESPONSE POWER USAGE CONTROL

机译:需求响应用电控制的多层控制

摘要

An energy usage coordinator controls the energy usage of individual buildingsof a group (or portfolio) of buildingsin one or more load zones These buildings have all contracted with an energycompany which controls (directly or indirectly) theenergy usage coordinator By agreeing to lower energy usage during times ofpeak usage (when the energy company may otherwisehave to pay very high pnces on the spot or short term market), the owners ormanagers of the buildings receive a preferential energyrate from the energy company The preferential rate may be a fixed orva.pi.able rate reduction Alternatively, the energy company maydetermine that energy is currently selling for twice what its buildingportfolio has contracted to pay, so it requests some portion ofthe portfolio to reduce usage so it can sell the excess/saved energy in themarket.
机译:能源使用协调员控制各个建筑物的能源使用一组(或一组)建筑物在一个或多个负载区中这些建筑物都收缩了能量控制(直接或间接)能源使用协调员通过同意在高峰使用(如果能源公司另有规定,必须在现货或短期市场上付出很高的便价),所有者或建筑物的管理者获得优惠能源能源公司的税率优惠税率可以是固定的,也可以是可变利率降低或者,能源公司可以确定当前能源的售价是其建筑的两倍投资组合已签约付款,因此要求投资组合以减少使用量,从而可以出售剩余/节省的能源市场。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号