首页> 外国专利> Mobile crane installation structure and method for replacing an upper structure of a railway bridge using the same

Mobile crane installation structure and method for replacing an upper structure of a railway bridge using the same

机译:移动式起重机的安装结构以及使用该结构的更换铁路桥梁的上部结构的方法

摘要

A movable crane installation structure and a replacing construction method of an upper structure of a railway bridge are provided to easily and rapidly replace an upper structure of a railway bridge which has 12m or more length without interference on the operation of a train. A replacing construction method of an upper structure of a railway bridge by using a movable crane installation structure(200) is composed of the step of additionally installing an expansion pier(221) in an existing pier(10), the step of installing a crane support girder(225) extended according to the throttling direction of a railway bridge in the upper part of the expanded bridge pier, the step of arranging a movable crane(210) having a lifting unit(211) for lifting a first upper structure(30) or a second upper structure on the crane support girder, the step of preparing the second upper structure on the railway bridge, the step of removing lifting the first upper structure from the bridge pier by lifting the first upper structure, and the step of installing the second upper structure in the position where the first upper structure is removed by lifting the second upper structure.
机译:提供一种活动式起重机安装结构和铁路桥梁的上部结构的更换施工方法,以容易且快速地更换长度为12m以上的铁路桥梁的上部结构,而不会干扰火车的运行。通过使用可移动的起重机安装结构(200)来代替铁路桥梁的上部结构的施工方法包括以下步骤:在现有的桥墩(10)中额外安装膨胀桥墩(221);安装起重机的步骤在扩展的桥墩的上部根据铁路桥梁的节流方向延伸的支撑梁(225),该步骤包括布置具有用于提升第一上部结构(30)的提升单元(211)的可移动起重机(210) )或起重机支撑梁上的第二上部结构,在铁路桥梁上准备第二上部结构的步骤,通过抬起第一上部结构从桥墩上抬起第一上部结构的步骤以及安装步骤在通过抬起第二上部结构而将第一上部结构移除的位置中的第二上部结构。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号