首页> 外国专利> INFLOW REDUCTION METHOD FOR TRANSITION ZONE BTWEEN CUT AND COER BORED TUNNEL

INFLOW REDUCTION METHOD FOR TRANSITION ZONE BTWEEN CUT AND COER BORED TUNNEL

机译:开挖与盖挖隧道过渡带入流减少方法

摘要

PURPOSE: An inflow water processing method in a connection part between an open cut structure and an underground tunnel structure is provided to reduce water leakage in a connection part of the structure by effectually preventing subsurface water from being infiltrated into the connection part of the open cut structure and the underground tunnel structure. CONSTITUTION: An inflow water processing method in a connection part between an open cut structure and an underground tunnel structure comprises following steps. A waterproof sheet is connected to an inclined upper side of a finish wall(120) of an open-cut box structure. A connection part of the waterproof sheet is covered with a waterproof film protective layer(400) including plain concrete. An influent water cutoff layer(500) including soil cement is formed on the upper part of the waterproof film protective layer and the box structure(100).
机译:目的:提供一种在明挖结构与地下隧道结构之间的连接部分中的流入水处理方法,以通过有效地防止地下水渗透到明挖结构的连接部分中来减少结构的连接部分中的漏水。结构和地下隧道结构。构成:明挖结构与地下隧道结构连接处的进水处理方法包括以下步骤。防水片连接到敞口切割的箱形结构的饰面壁(120)的倾斜的上侧。防水片的连接部分被包括纯混凝土的防水膜保护层(400)覆盖。在防水膜保护层和箱体结构(100)的上部形成由土壤水泥构成的入水防渗层(500)。

著录项

  • 公开/公告号KR100924794B1

    专利类型

  • 公开/公告日2009-11-03

    原文格式PDF

  • 申请/专利权人 ENGINEERS & CONSULTANT CO. LTD.;KIM SEUNG RYULL;

    申请/专利号KR20090032880

  • 发明设计人 KIM SEUNG RYULL;

    申请日2009-04-15

  • 分类号E02D31/02;E21D11/38;

  • 国家 KR

  • 入库时间 2022-08-21 19:11:31

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号