首页> 外国专利> Signed a construction site installation conclusion tool

Signed a construction site installation conclusion tool

机译:签订了施工现场安装总结工具

摘要

This is the their screening designed to install the blanking plates perforated plate on a construction site with a synthetic resin around the holding More concrete relates to the fastening to obtain used to attach "U" shape by fastening the band (1) connecting screw holes in the central apex 101 is formed of a fixing bolt (5) is opened and the screw assembly of the fastening band each fastening band to both ends-section (1) to form the projection pieces 102 to be outwardly protruded from the lower end face inclined As its lower end within the bending piece 103 to form a hanging loop (1a) on the lower outer side forms a fastening band, and the rotating shaft (2) formed by combining allows rotation about the rotation axis by inserting the connecting hole (301) formed on the lower side of the operating band (3) that is superposed on the outer surface and the fastening band into a "U" shaped, such as a fastening band, and the lower end the inclined lower end portion projecting outwardly and operate in the band projecting piece (102) and opposing protruding pieces 302 to form the bending piece toward the (103) formed on the fastening band side protruding at the lower end bending piece of the fastening band 303 is formed hanging loop (3a) are formed, the rotating shaft (2) to the coil spring 4 by sandwiching both ends of the stone published (4a) (4b) is hanging loop (1a) (3a) constituting the protruding pieces 102, 302 fixing grooves formed in the upper end of 104, against the spring hanging loop sandwiching be Jangjin extracting the (304) (1a) (3a) thereby accumulated between the elastic band and forms a work (3) handle (3c) at the upper end, and two hanging loop (1a) (3a) so that between the connecting holes of the operating band is required to be close-distance more than 301 and the protruding pieces 102 formed in a construction site is hayeoseo rotation restricting projection (6) between their screening installation of the fastening band (1) entered into a sphere.
机译:这是他们的筛选设计,用于将盲板多孔板安装在建筑工地上,并在支架周围安装合成树脂。具体而言,本发明涉及通过将连接螺丝孔的带子(1)紧固在用于获得“ U”形的紧固件上。中央顶点101由固定螺栓(5)形成,并且将紧固带的螺钉组件分别紧固到两端部(1),以形成从下端面倾斜地向外突出的突出片102。由于其在弯曲件103内的下端在下部外侧上形成悬挂环(1a)而形成紧固带,并且通过组合形成的旋转轴(2)通过插入连接孔(301)而绕旋转轴旋转。 )形成在操作带(3)的下侧,该操作带叠置在外表面和紧固带上,形成为“ U”形,例如紧固带,并且下端向外倾斜。 d。在带子突出片(102)和相对的突出片302上操作,以朝形成于紧固带侧(103)的弯曲片(103)形成弯曲片,该弯曲片在紧固带303的下端弯曲片上突出而形成吊环(3a)形成后,将旋转轴(2)夹在螺旋弹簧4的两端,将发表的石材(4a)(4b)悬挂在构成突出片102、302的固定环(1a)(3a)的上部形成于固定槽104的一端,张紧紧靠弹簧悬挂环,将(304)(1a)(3a)抽出,从而在弹性带之间堆积并在上端形成工件(3)手柄(3c),两个悬挂环(因此,在图1a)(3a)中,要求在操作带的连接孔之间的距离必须大于301,并且在施工现场形成的突出片102是在其紧固装置的屏蔽安装之间的八重濑旋转限制突起(6)。带(1)进入一个球体。

著录项

  • 公开/公告号KR200444847Y1

    专利类型

  • 公开/公告日2009-06-04

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20090002224U

  • 发明设计人

    申请日2009-02-27

  • 分类号E04G21/32;E04G7/06;

  • 国家 KR

  • 入库时间 2022-08-21 19:11:26

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号