首页> 外国专利> WELL JET FACILITY FOR HYDRO-DYNAMIC TESTS OF WELL

WELL JET FACILITY FOR HYDRO-DYNAMIC TESTS OF WELL

机译:井水动力测试的井射流设施

摘要

FIELD: oil and gas industry.;SUBSTANCE: facility is designed for extracting of oil from wells and can be employed to determine conditional values of filtration-capacity parameters of reservoirs at different stages of oil and gas deposits development and to intensify oil extraction. The facility incorporates a packer and a jet pump installed at the pipe string from bottom up; the said pump consists of a case with an active nozzle and a mixing chamber arranged along the pipe string, and also it consists of pumped-off medium supply channel and a step-by-step pass-through channel both assembled in the case coaxially to the pipe string where the step-by-step pass-through channel is installed above the supply channel of pumped-off medium; the step-by-step pass-through channel is equipped with a seat to receive an insertion for registering curves of pressure build-up. In the registering curves of pressure build-up insertion there are upper and lower rods; the said rods have apertures through which there runs an electrical connection between an instrument head tied with the upper rod and a cable tag tied to the lower rod. Positions of the upper and lower rods in the case are fixed with a spring, while a spring loaded valve is located at the lower rod.;EFFECT: reduced time of operation.;2 cl, 1 dwg
机译:领域:石油和天然气工业。物质:该设施用于从井中开采石油,可用于确定油气藏开发不同阶段的储层过滤能力参数的条件值,并加强采油。该设施包括一个封隔器和一个从下往上安装在管柱上的喷射泵。所述泵由沿着管柱布置的具有主动喷嘴和混合室的壳体组成,并且还包括泵出的介质供应通道和逐步通过通道,二者均与壳体同轴地组装在壳体中。在抽出的介质的供应通道上方安装有逐步通过通道的管柱;逐步通过通道配有阀座,用于容纳用于记录压力累积曲线的插入物。在压力累积插入的记录曲线中,有上,下杆。所述杆具有孔,通过该孔在与上杆绑在一起的仪器头和与下杆绑在一起的电缆标签之间进行电连接。机壳中上,下杆的位置由弹簧固定,而在下杆上装有弹簧阀;效果:减少了操作时间; 2 cl,1 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号