FIELD: electricity.;SUBSTANCE: present invention relates to automation of electrical networks and is meant for monitoring unsuccessful operation of unit for automatic load transfer (ALT) during failure of separation automation (SA) of a sectiolised circuit breaker in a line. To achieve technical outcome, current surges are recorded and time between them is measured, starting from the onset of the first short circuit (SC) current surge on the transformer bus-bars of the primary power source. Time is taken, equal to reclosing dead time of the head switch, coming off the transformer bus-bars of the primary power source of the line, and at the end of time keeping, onset of the second short circuit current surge on the transformer bus-bars of the primary power source is monitored. If this short circuit current surge appears time is taken, equal to the time of operation of the unit for automatic load transfer. At the end of this onset of short circuit (SC) current surge on transformer bus-bars of a back-up power source is monitored, and its presence indicates unsuccessful operation of the unit for automatic load transfer during failure of separation automation of a sectiolised circuit breaker in a line. The existing method does not give information on unsuccessful switching of a unit for automatic load transfer in a ring network, powered from different bus-bars of two-transformer substations, during failure of separation automation of a sectiolised circuit breaker in a line. The proposed method allows for increasing functional capabilities due to obtaining information on unsuccessful operation of a unit for automatic load transfer during failure of separation automation of a sectiolised circuit breaker in a line.;EFFECT: more functional capabilities due to obtaining information on unsuccessful operation of a unit for automatic load transfer during failure of separation automation of a sectiolised circuit breaker in a line.;2 dwg
机译:技术领域本发明涉及电网的自动化,并且意在监视线路中的安全断路器的分离自动化(SA)故障期间用于自动负荷转移(ALT)的单元的不成功操作。为了获得技术成果,从主电源的变压器母线上的第一次短路(SC)电流浪涌开始,就记录电流浪涌并测量它们之间的时间。所花费的时间等于重新闭合前部开关的死区时间,从线路的主电源的变压器母线脱离,并在计时结束时开始在变压器母线上产生第二个短路电流浪涌-监视主电源的-bars。如果出现这种短路电流浪涌,则需要花费时间,该时间等于用于自动负载转移的设备的运行时间。在备用电源的变压器母线上的短路(SC)浪涌开始时,将对其进行监视,并且该故障的出现表明在安全化隔离自动化失败时,该单元无法成功进行自动负载转移线路中的断路器。现有的方法没有提供关于在线路中的安全断路器的自动化分离失败的情况下,由两个变压器变电站的不同母线供电的,用于环网中的自动负载转移的单元切换失败的信息。所提出的方法由于在线路中的安全断路器的分离自动化的失败期间获得关于用于自动负载转移的单元的不成功操作的信息而增加了功能能力。效果:由于获得了关于断路器的不成功操作的信息而获得了更多的功能。在线路中的安全断路器的分离自动化失败时用于自动负载转移的单元; 2 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号