首页> 外国专利> Wind power plant optimal installation method for producing electrical energy, involves treating location problem analogous to creation of optimal stock portfolio and drawing surplus off-peak power into solar supported heating systems

Wind power plant optimal installation method for producing electrical energy, involves treating location problem analogous to creation of optimal stock portfolio and drawing surplus off-peak power into solar supported heating systems

机译:风力发电厂用于发电的最佳安装方法,包括处理类似于创建最佳库存投资组合的位置问题,并将多余的非高峰电力吸收到太阳能支持的加热系统中

摘要

The method involves treating location problem analogous to creation of an optimal stock portfolio. Stock price in stock portfolio problem corresponds to time-resolved wind force measurements. Probabilities and risks for off-peak power production are determined at time of small demands. A number of immersion heater systems in households is determined based on the determined probabilities. Surplus off-peak power is drawn into solar supported heating systems using the immersion heater systems for heating water contained in the heating systems.
机译:该方法涉及类似于创建最佳股票投资组合的位置问题。股票组合中的股票价格问题对应于时间分辨的风力测量值。非高峰期发电的可能性和风险是在需求较小时确定的。基于确定的概率确定家庭中的多个浸入式加热器系统。使用浸入式加热器系统将多余的非高峰功率吸收到太阳能支持的加热系统中,以加热加热系统中包含的水。

著录项

  • 公开/公告号DE102008022060A1

    专利类型

  • 公开/公告日2009-11-05

    原文格式PDF

  • 申请/专利权人 MORGENSTERN INGO;

    申请/专利号DE20081022060

  • 发明设计人 MORGENSTERN INGO;

    申请日2008-05-03

  • 分类号F03D11/04;

  • 国家 DE

  • 入库时间 2022-08-21 19:09:10

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号