首页> 外国专利> Pit/reserve forming method for e.g. supply tube, in concrete building, involves integrating base to pre-slabs during casting to allow transportation of pre-slabs, and arranging base to receive cover with height adjusted based on slab height

Pit/reserve forming method for e.g. supply tube, in concrete building, involves integrating base to pre-slabs during casting to allow transportation of pre-slabs, and arranging base to receive cover with height adjusted based on slab height

机译:坑/储备形成方法例如在混凝土建筑中,供应管涉及在浇铸过程中将基座集成到预制板上以允许预制板的运输,并安排基座以容纳根据板高调整高度的盖

摘要

The method involves arranging prefabricated pre-slabs (3) on horizontal elements of a framework. A slab is placed around a prefabricated trench box that is formed by a base (1) and a cover (2), where height of the base corresponds to that of the pre-slabs. The base is integrated to the pre-slabs during casting to allow transportation of the pre-slabs due to uniform height of the base and pre-slabs. The base is arranged for receiving the cover during installation of the base on a working area (5), where height of the cover is adjusted based on the height of the slab to be formed by casting.
机译:该方法包括在框架的水平元件上布置预制的预制板(3)。将一块平板放置在预制的沟槽箱周围,该沟槽盒由底座(1)和盖(2)形成,其中底座的高度与预制的高度相对应。在铸造过程中,基座与预制板集成在一起,以使由于基座和预制板的高度均匀而可以运输预制板。基座布置成用于在将基座安装在工作区域(5)上时接收覆盖物,其中,根据要通过铸造形成的平板的高度来调节覆盖物的高度。

著录项

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号