首页> 外国专利> FJ CONSTRUCTION METHOD FOR PIPE INTEGRATING PREFABRICATING TYPE

FJ CONSTRUCTION METHOD FOR PIPE INTEGRATING PREFABRICATING TYPE

机译:管道一体化预制型的FJ施工方法

摘要

PROBLEM TO BE SOLVED: To solve the following problems: the quality of products varies according to the conditions of a site (site location, timing of work execution, seasons and the number of workers) in a conventional in-situ construction method (positioning, measurement, transportation of materials, cutting, assembling and water leak test); the conventional in-situ construction method is restricted in terms of resource saving, e.g., a case in which a certain material cannot be used can occur in terms of storage conditions, in particular, leakage of water can occur in a condominium such as an apartment house for the lack of execution work control of drain piping to cause a severe damage to an underfloor, which could be a problem of compensation.;SOLUTION: Materials are processed at facilities outside of the site (FJ construction method) to achieve assurance of high quality of products, enhance a product system per site, shorten the term of work at the site, achieve effective use of resources, reduce the number of workers, improve work and achieve many other advantages.;COPYRIGHT: (C)2010,JPO&INPIT
机译:要解决的问题:解决以下问题:采用传统的现场施工方法(定位,定位,测量,材料运输,切割,组装和漏水测试);传统的现场施工方法在资源节省方面受到限制,例如,在储存条件方面会发生无法使用某种材料的情况,特别是在公寓等公寓中会发生漏水的情况。缺乏排水管执行工作控制以致严重损坏地板的房屋,这可能是补偿问题。;解决方案:材料在场外设施处加工(FJ施工方法),以确保较高的安全性产品质量,改善每个站点的产品体系,缩短站点的工作期限,有效利用资源,减少工人数量,改善工作并取得许多其他优势。;版权所有:(C)2010,JPO&INPIT

著录项

  • 公开/公告号JP2010185265A

    专利类型

  • 公开/公告日2010-08-26

    原文格式PDF

  • 申请/专利权人 KURIYAMA OSAMU;

    申请/专利号JP20090052640

  • 发明设计人 KURIYAMA OSAMU;

    申请日2009-02-12

  • 分类号E03C1/122;F16L1/00;

  • 国家 JP

  • 入库时间 2022-08-21 19:05:43

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号