首页> 外国专利> METHOD FOR CONSTRUCTING CUT-OFF STRUCTURE, AND CUT-OFF STRUCTURE

METHOD FOR CONSTRUCTING CUT-OFF STRUCTURE, AND CUT-OFF STRUCTURE

机译:切除结构的构造方法及切除结构

摘要

PROBLEM TO BE SOLVED: To provide a method for constructing a cut-off structure which hardly deteriorates the property of following displacement caused by an aperture etc.;SOLUTION: In the method constructing the cut-off structure 10 of an underground structure 1 constituted by continuously installing first and second building frames 2a and 2b, the method is characterized by including: a first building frame construction step of constructing the first building frame 2a; a seal attachment step of fixing a seal member 11 to a seal attachment surface formed on the first building frame 2a; a seal compressing step of compressing the seal member 11 between the seal attachment surface and the joint end surface plate 12 by arranging the joint end surface plate 12 in such a manner as to face the seal attachment surface, and keeping an isolation distance between the joint end surface plate 12 and the first building frame 2a constant so as to maintain the compressed state of the seal member 11; and a second building frame construction step of constructing the second building frame 2b next to the first building frame 2a, and fixing the joint end surface plate 12 to the second building frame 2b.;COPYRIGHT: (C)2010,JPO&INPIT
机译:解决的问题:提供一种构造截断结构的方法,该结构几乎不恶化由孔等引起的随动位移的性质;解决方案:在构造由以下组成的地下结构1的截断结构10的方法中:该方法的特征在于,连续地安装第一和第二建筑框架2a和2b。密封件安装步骤,将密封件11固定到形成在第一建筑物框架2a上的密封件安装表面上。密封压缩步骤,通过以面对密封件安装表面的方式布置接合端面板12,并保持接合之间的隔离距离,来将密封构件11压缩在密封件附接表面与接合端面板12之间。端面面板12和第一建筑框架2a恒定,以保持密封构件11的压缩状态。以及第二建筑框架构造步骤,其在第一建筑框架2a的旁边构造第二建筑框架2b,并将接合端面板12固定到第二建筑框架2b 。;版权所有:(C)2010,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号