首页> 外国专利> PEAK LOAD MANAGEMENT THROUGH COMBINED CYCLE POWER GENERATION AUGMENTATION USING PEAKING CYCLE EXHAUST HEAT RECOVERY

PEAK LOAD MANAGEMENT THROUGH COMBINED CYCLE POWER GENERATION AUGMENTATION USING PEAKING CYCLE EXHAUST HEAT RECOVERY

机译:通过使用循环排气余热回收的联合循环发电增强峰值负荷管理

摘要

PROBLEM TO BE SOLVED: To provide a system and method for augmenting the power generation capabilities of a combined cycle power generation system.;SOLUTION: In certain embodiments, the present techniques can include receiving superheated steam from a heat recovery steam generation (HRSG) unit 32. Heated exhaust gas from a peaking cycle gas turbine 66 can be used to transfer heat to the superheated steam received from the HRSG 32. The systems used to transfer the heat to the superheated steam can include a supplementary superheater located in the exhaust path 82 of the peaking cycle gas turbine 66. The superheated steam exiting the supplementary superheater can be delivered to the steam turbine 22 of the combined cycle power generation system 64, where the superheated steam can be used as a power source.;COPYRIGHT: (C)2010,JPO&INPIT
机译:解决的问题:提供一种用于增加联合循环发电系统的发电能力的系统和方法。解决方案:在某些实施例中,本技术可以包括从热回收蒸汽产生(HRSG)单元接收过热蒸汽。 32.来自峰值循环燃气轮机66的加热的废气可用于将热量传递给从HRSG 32接收的过热蒸汽。用于将热量传递给过热蒸汽的系统可包括位于排气通道82中的辅助过热器离开补充过热器的过热蒸汽可以被输送到联合循环发电系统64的蒸汽涡轮22,在这里该过热蒸汽可以用作动力源。版权所有:(C) 2010,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号