首页> 外国专利> METHOD OF DETERMINING ASSEMBLING SEQUENCE OF AUTOMATIC MACHINE IN MIXED PRODUCTION SYSTEM

METHOD OF DETERMINING ASSEMBLING SEQUENCE OF AUTOMATIC MACHINE IN MIXED PRODUCTION SYSTEM

机译:确定混合生产系统中自动机装配顺序的方法

摘要

PPROBLEM TO BE SOLVED: To determine an assembling sequence in a mixed production system, so as to eliminate delay of the start of a test due to the test sequence of a product to be tested and allocation to a testing device, and efficiently execute subsequent tests by increasing spare time of each test time even if any trouble occurs in the set test sequence. PSOLUTION: The mixed production system includes an equipment operation instructing apparatus for monitoring entry to the test and test states of a product or the like, and configured to acquire the product information, process changeover time and the test sequence of a product, and to calculate the test start time and test end time of the product, a test delay time from the entry time to test start and a testing machine spare time between the tests of the products, and to determine the optimal assembling sequence to the testing machine based on the test delay time and spare time in the set test sequence. PCOPYRIGHT: (C)2010,JPO&INPIT
机译:

要解决的问题:确定混合生产系统中的组装顺序,以消除由于要测试的产品的测试顺序和分配给测试设备而导致的测试开始的延迟。即使在设定的测试顺序中出现任何问题,也可以通过增加每个测试时间的备用时间来执行后续测试。

解决方案:混合生产系统包括设备操作指导设备,用于监视产品等的测试和测试状态的输入,并配置为获取产品信息,过程转换时间和产品的测试顺序,计算产品的测试开始时间和测试结束时间,从进入时间到测试开始的测试延迟时间以及产品测试之间的测试机备用时间,并确定与测试机的最佳组装顺序根据设置的测试序列中的测试延迟时间和备用时间。

版权:(C)2010,日本特许厅&INPIT

著录项

  • 公开/公告号JP2010152454A

    专利类型

  • 公开/公告日2010-07-08

    原文格式PDF

  • 申请/专利权人 FUJITSU LTD;

    申请/专利号JP20080327122

  • 发明设计人 MAITA MASATOMO;

    申请日2008-12-24

  • 分类号G05B19/418;

  • 国家 JP

  • 入库时间 2022-08-21 19:02:30

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号