首页> 外国专利> TRAINING INSTALLATION OF STEAM-TURBINE SPEED GOVERNOR

TRAINING INSTALLATION OF STEAM-TURBINE SPEED GOVERNOR

机译:汽轮机调速器的培训安装

摘要

PROBLEM TO BE SOLVED: To provide a training installation of a steam-turbine speed governor that generates a simulated failure simulating a failure in a speed governor actually provided at a power plant, and that helps an operator at the power plant improve his/her failure recovery technique by having the operator handle the simulated failure to cause him/her to learn how to identify a failure cause of the speed governor.;SOLUTION: The training installation 1 of the steam-turbine speed governor includes: a simulated steam valve 64; simulated differential transformers 61 and 65 that have the same structure as that of a differential transformer for detecting a variation in opening of a steam valve and that detect a variation in opening of the simulated steam valve; simulated control motors 63 and 68 that simulate a control motor for driving the steam valve; and a simulated load limiter 67 that includes a function of a load limiter for limiting output from a generator operating together with the steam turbine within a predetermined allowance, and further includes a simulated-failure generating unit 10 that generates a simulated failure in at least one of the simulated differential transformers, the simulated control motors, and the simulated load limiter.;COPYRIGHT: (C)2010,JPO&INPIT
机译:要解决的问题:提供蒸汽轮机调速器的培训安装,该设备会生成模拟故障,以模拟发电厂实际提供的调速器的故障,并帮助发电厂的操作员改善其故障。通过使操作员处理模拟故障以使他/她学习如何识别调速器的故障原因,从而获得一种恢复技术。解决方案:汽轮机调速器的培训设备1包括:模拟蒸汽阀64;模拟差动变压器61和65,其结构与用于检测蒸汽阀的开度变化并检测模拟蒸汽阀的开度变化的差动变压器相同。模拟控制马达63和68,其模拟用于驱动蒸汽阀的控制马达;模拟负荷限制器67,其包括负荷限制器的功能,该负荷限制器用于将与蒸汽涡轮一起运行的发电机的输出限制在预定的允许范围内,并且还包括模拟故障产生单元10,其在至少一个中产生模拟故障。模拟差动变压器,模拟控制电动机和模拟负载限制器。;版权所有:(C)2010,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号