首页> 外国专利> INSTALLATION METHOD FOR WATER CUT-OFF BOX AND WATER CUT-OFF BOX

INSTALLATION METHOD FOR WATER CUT-OFF BOX AND WATER CUT-OFF BOX

机译:缺水箱和缺水箱的安装方法

摘要

PROBLEM TO BE SOLVED: To provide an installation method for a water cut-off box for installing the water cut-off box efficiently without using large-scale supporting facilities and machinery and materials needed for the installation by letting the water cut-off box used in the work for repairing a steel sheet pile structure float on the surface of the sea and bringing the box into an optional prearranged installation section such as a comparatively narrow water channel or the like.;SOLUTION: When installing the water cut-off box A of front opening type in the steel sheet pile structure 51 to carry out the work for repairing the steel sheet pile structure 51, the water cut-off box A is made to float on the surface of the sea by buoyancy tanks 20, 30, 40 provided on its outer face and is pulled in front of the steel sheet pile structure 51 in the prearranged installation section. Attitude and depth of the water cut-off box A are adjusted by adjusting buoyancy of the buoyancy tanks 20, 30, 40 to let a front face of the water cut-off box A oppose to the steel sheet pile structure 51 and abut it on a surface of the steel sheet pile structure 51 for the installation.;COPYRIGHT: (C)2010,JPO&INPIT
机译:要解决的问题:提供一种用于分水箱的安装方法,该方法可以通过使用所用的分水箱来有效地安装分水箱而无需使用大规模的配套设施以及安装所需的机械和材料。在修理浮在海面上的钢板桩结构的工作中,并将盒子带到可选的预先安排的安装区域,例如相对狭窄的水道等;解决方案:安装分水盒A时在钢板桩结构51中进行前开口型的修理工作的钢板桩结构51中,通过浮力箱20、30、40使除水盒A漂浮在海面上。设置在其外表面上并且在预定的安装部分中被拉向钢板桩结构51的前方。通过调节浮力箱20、30、40的浮力来调节分水箱A的姿态和深度,以使分水箱A的前表面与钢板桩结构51相对并且抵接在钢板桩结构51上。钢板桩结构51的安装表面。版权所有:(C)2010,日本特许厅&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号