首页> 外国专利> Setting the plural courses of traverse where length

Setting the plural courses of traverse where length

机译:设置长度的复数行进

摘要

PROBLEM TO BE SOLVED: To facilitate the prediction of breakage and collapse of ground and enhance the reliability of the prediction. ;SOLUTION: Two or more profile lines differed in length are set in a prediction subject area GA where the ground is predicted to be unstable, electrodes 1 are set on both sides thereof, and the ground potential difference is measured between the electrodes 1 and 1, respectively. The measured ground potential difference data are recorded every fixed time by a data logger 2, and transmitted to a personal computer 7 set in an observation station or the like through a data transmitting means 3, where necessary processing such as noise removal or the like is performed to evaluate a collapse or breakage precursory phenomenon of the ground of the area GA.;COPYRIGHT: (C)2003,JPO
机译:要解决的问题:便于预测地面的破裂和倒塌,并提高预测的可靠性。 ;解决方案:在预测对象区域GA中设置了两条或更多条长度不同的轮廓线,在该对象区域中,地面被预测为不稳定,在其两侧设置了电极1,并测量了电极1和1之间的接地电位差, 分别。所测量的地电位差数据每隔固定时间由数据记录器2记录,并通过数据传输装置3传输到设置在观测站等中的个人计算机7,其中需要进行诸如噪声去除等的处理。用来评估GA地面塌陷或破裂的先兆现象。;版权所有:(C)2003,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号