首页> 外国专利> METHOD OF ASSEMBLING AND INSTALLING A VERY LARGE FLOATING BARGE FOR EXAMPLE FOR PROCESSING GAS OR CRUDE OIL AT SEA

METHOD OF ASSEMBLING AND INSTALLING A VERY LARGE FLOATING BARGE FOR EXAMPLE FOR PROCESSING GAS OR CRUDE OIL AT SEA

机译:组装和安装非常大的浮船的方法,例如,用于加工海中的天然气或原油

摘要

Method of assembling and installing a very large floating barge for example for processing gas or crude oil at seaAbstract The method of assembling and installing the very large floating barge (1) consists of manufacturing each side portion (10) and each connection portion (15) separately, placing each side portion (10) on the water, moving the connection portions (15) between the side portions (10), moving the connection portions (15) vertically, fixing the connection portions (10) to the side portions (15) and taking the barge (1) to the operation site.Fig. 1
机译:组装和安装非常大的浮船的方法,例如海上加工天然气或原油抽象组装和安装超大型浮船(1)的方法包括分别制造每个侧面部分(10)和每个连接部分(15),并放置水上的每个侧面部分(10),在侧面之间移动连接部分(15)部分(10),垂直移动连接部分(15),固定连接部分(10)移至侧面部分(15),并将驳船(1)移至手术部位。图。1

著录项

  • 公开/公告号SG163988A1

    专利类型

  • 公开/公告日2010-09-29

    原文格式PDF

  • 申请/专利权人 TECHNIP FRANCE;

    申请/专利号SG2010059152

  • 发明设计人 CHOLLEY JEAN-MARC;THOMAS PIERRE-ARMAND;

    申请日2009-02-09

  • 分类号

  • 国家 SG

  • 入库时间 2022-08-21 18:44:23

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号