首页> 外国专利> METHOD AND DEVICE FOR CONTROLLING THE SYNCHRONIZATION OF CYLINDER/PISTON UNITS AND FOR REDUCING PRESSURE PEAKS DURING FORMING AND/OR FINEBLANKING ON A FINEBLANKING OR STAMPING PRESS

METHOD AND DEVICE FOR CONTROLLING THE SYNCHRONIZATION OF CYLINDER/PISTON UNITS AND FOR REDUCING PRESSURE PEAKS DURING FORMING AND/OR FINEBLANKING ON A FINEBLANKING OR STAMPING PRESS

机译:用于控制气缸/活塞单元的同步并减少在冲裁或压模压力机上成型和/或冲裁时的压力峰值的方法和装置

摘要

PURPOSE: A method and a device for controlling the synchronization of cylinder/piston units and reducing pressure peaks during forming and/or fine blanking on a fine blanking or stamping press are provided to improve cycle rate and speed by synchronizing the cylinder/piston unit with a ram. CONSTITUTION: A method for controlling the synchronization of cylinder/piston units and reducing pressure peaks comprises following steps. A cylinder/piston unit(1) is continuously maintained at cushion pressure(P1) which is regulated in advance by an accumulator(10). The cylinder/piston unit is controlled by the outlet pressure which is regulated in advance. The pressure is set up as the pressure for forming and/or blanking and the pressure changed between the cushion pressures by supplying control oil to a second accumulator(19). The rise of the pressure due to the collision of the tool and the workpiece discharges the pressure pulse to a tank, so the pressure is controlled to allowable configuration pressure.
机译:目的:提供一种方法和装置,用于控制气缸/活塞单元的同步,并在精冲或冲压机上成型和/或精冲时降低压力峰值,以通过使气缸/活塞单元与一只公羊。组成:一种控制气缸/活塞单元同步并降低压力峰值的方法,包括以下步骤。气缸/活塞单元(1)连续保持在缓冲压力(P1),该压力预先由蓄能器(10)调节。气缸/活塞单元由事先调节的出口压力控制。通过将控制油供应到第二蓄能器(19),将压力设定为用于形成和/或冲切的压力,以及在垫压力之间改变的压力。由于工具和工件的碰撞而引起的压力上升将压力脉冲排放到油箱,因此将压力控制为允许的配置压力。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号