首页> 外国专利> SHOCK-ABSORBING ROCK BLASTING METHOD TO REDUCE VIBRATIONS AND NOISE DURING BLASTING BY SEALING THE GAP BETWEEN AN EXPLOSIVE AND A BORE HOLE WALL

SHOCK-ABSORBING ROCK BLASTING METHOD TO REDUCE VIBRATIONS AND NOISE DURING BLASTING BY SEALING THE GAP BETWEEN AN EXPLOSIVE AND A BORE HOLE WALL

机译:爆破与孔眼之间的缝隙封闭的减震岩石爆破方法,减少爆破时的振动和噪声

摘要

PURPOSE: A shock-absorbing rock blasting method is provided to reduce the blasting pressure applied to a bore hole by filling the gap between an explosive and a bore hole wall.;CONSTITUTION: A shock-absorbing rock blasting method comprises the steps of: punching a bore hole(S10), inserting a guide pipe in the bore hole(S20), inserting an explosive in the bore hole(S30), placing a buffer material in the bore hole(S40), and removing the guide pipe(S50). A vinyl cover is installed on the outside of the guide pipe and inserted into the bore hole together with the guide pipe. The vinyl cover is left in the bore hole when the guide pipe is removed.;COPYRIGHT KIPO 2010
机译:目的:提供一种减震爆破方法,通过填充炸药和钻孔壁之间的间隙来降低施加于钻孔的爆破压力。组成:减震爆破方法包括以下步骤:冲孔钻孔(S10),将导管插入钻孔(S20),将炸药插入钻孔(S30),将缓冲材料放入钻孔(S40),并卸下导管(S50) 。乙烯基盖安装在导管的外部,并与导管一起插入钻孔中。取下导管后,乙烯基盖留在钻孔中。; COPYRIGHT KIPO 2010

著录项

  • 公开/公告号KR20100045121A

    专利类型

  • 公开/公告日2010-05-03

    原文格式PDF

  • 申请/专利权人 KIM HO CHEOL;

    申请/专利号KR20080104175

  • 发明设计人 KIM HO CHEOL;

    申请日2008-10-23

  • 分类号F42D3/04;

  • 国家 KR

  • 入库时间 2022-08-21 18:32:53

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号