首页> 外国专利> TRANSMISSION LINE SAG MEASUREMENT METHOD CAPABLE OF MINIMIZING A MEASUREMENT ERROR

TRANSMISSION LINE SAG MEASUREMENT METHOD CAPABLE OF MINIMIZING A MEASUREMENT ERROR

机译:能够使测量误差最小化的传输线凹陷测量方法

摘要

PURPOSE: A transmission line sag measurement method is provided to accurately measure the current sag of a power line about an iron tower and easily construct the design sag of a power line.;CONSTITUTION: A measuring apparatus is installed in a spot where an electric line support point of both sides pylon is seen(ST1). The measuring apparatus is installed in one electric line support point among the pylons(ST2). The measuring apparatus transmits collimation value data to a PDA(ST3), wirelessly or using a cable. The measuring apparatus collimates about the electric wire support point of a different pylon(ST4). The PDA calculates the location of the horizontal angle of a sag reference line and displays it(ST6). The PDA displays the sag value(ST7).;COPYRIGHT KIPO 2010
机译:目的:提供一种传输线垂度的测量方法,以准确地测量铁塔周围电力线的电流垂度,并轻松构造电力线的设计垂度。;构成:将测量设备安装在电线的现场可以看到两侧塔架的支撑点(ST1)。该测量装置安装在塔架(ST2)中的一个电线支撑点中。测量设备无线或使用电缆将准直值数据发送到PDA(ST3)。测量设备在另一塔架(ST4)的电线支撑点附近准直。 PDA计算下垂参考线的水平角位置并显示(ST6)。 PDA显示下垂值(ST7)。; COPYRIGHT KIPO 2010

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号