首页> 外国专利> Way to create conditions for the prevention of flooding Novovoronezh nuclear power plant

Way to create conditions for the prevention of flooding Novovoronezh nuclear power plant

机译:为预防新沃罗涅日核电站创造条件创造条件的方法

摘要

The method of creating the conditions to prevent the flooding of the territory of the Novovoronezh nuclear power plant, including the construction of diversion channels for the passage of water from the reservoir water area bypassing sites cherished objects, characterized in that as a priority, organizing body structure deaf dam in the Voronezh River valley in the vicinity of the foot of earth dam Voronezh reservoir from bottom water along its entire length from the left bank of the reservoir spillway to concrete structures near the right reservoir shore by layering and soil compaction withdrawn from the bed being built deep gravity navigable channel intended for water drainage from Voronezh reservoir radical Don channel below territory Novovoronezh, and to protect the low-lying left bank Don and Novovoronezh buildings from flooding stormwater and flood runoff from the catchment area of ​​the Upper Don just arrange overlapping Don valley above the mouth of Pine river - the right tributary of the Don and the diversion of water from created by the Upper Reservoir in the waters of the Voronezh River above the town of Lipetsk.
机译:为防止新沃罗涅日核电站的领土泛滥而创造条件的方法,包括为从水库水域绕过珍贵物体的水通道引水道的建设,其特征在于,优先机构沃罗涅日河谷地坝附近的沃罗涅日河河谷的结构性聋坝,通过分层和从土壤中抽出的土壤压实,从底部水沿其整个长度,从水库溢洪道的左岸到右水库岸边附近的混凝土结构,一直流向沃罗涅日水库。正在建造新的深重力通航河道,用于从新沃罗涅日以下领土的沃罗涅日水库激进唐河道进行排水,并保护低处的左岸唐和新沃罗涅日建筑免受洪水的侵蚀和上游唐河集水区的洪水径流只是在松河河口上方布置重叠的唐谷-右贡顿河三峡和利佩茨克镇上方沃罗涅日河水域中的上游水库产生的水分流。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号