The method of creating the conditions to prevent the flooding of the territory of the Novovoronezh nuclear power plant, including the construction of diversion channels for the passage of water from the reservoir water area bypassing sites cherished objects, characterized in that as a priority, organizing body structure deaf dam in the Voronezh River valley in the vicinity of the foot of earth dam Voronezh reservoir from bottom water along its entire length from the left bank of the reservoir spillway to concrete structures near the right reservoir shore by layering and soil compaction withdrawn from the bed being built deep gravity navigable channel intended for water drainage from Voronezh reservoir radical Don channel below territory Novovoronezh, and to protect the low-lying left bank Don and Novovoronezh buildings from flooding stormwater and flood runoff from the catchment area of the Upper Don just arrange overlapping Don valley above the mouth of Pine river - the right tributary of the Don and the diversion of water from created by the Upper Reservoir in the waters of the Voronezh River above the town of Lipetsk.
展开▼