首页> 外国专利> METHOD OF THE CONDITIONS FOR BED Projected ship canal 'Eurasia' FLOW FRESH WATER

METHOD OF THE CONDITIONS FOR BED Projected ship canal 'Eurasia' FLOW FRESH WATER

机译:床投影船舶运河“欧亚”流量淡水的条件方法

摘要

1. A method of creating conditions for the projected channel navigable channel "Eurasia" flowing fresh water, comprising the use of part length Kuma-Manychskaya hollow channel for tracing through the dividing line between the Black Sea region and the Caspian Sea basin and parts Proletarsky reservoir waters after its recess characterized in that the return channel into the channel of the reset much of the volume of runoff flowing from the slopes of the Caucasian and hot carriers in their waters of large masses of clay and sand, Feeding and South East branches channel "Eurasia" carry fresh water from Summing Volgogradsky reservoir for artificial riverbed channel "Volga-Don-2", resulting in creating conditions for preventing the accumulation of sediment in the mainstream channel "Eurasia". ! 2. The method according to claim 1, characterized in that the feeding channel "Eurasia" Volga water conditions will be created for the use of the total volume flow of rivers flowing through the territory of Ciscaucasia, to meet the needs of the population and industrial enterprises in fresh water, as well as for irrigation and irrigation of land. ! 3. A method according to claim 1, characterized in that by arranging removal of excess amounts of water from the reservoir through the bed Volgogradsky channel "Volga-Don-2" will be established conditions to prevent further lifting of the water level in the Caspian Sea due to increased water content Volga . ! 4. A method according to claim 1, characterized in that simultaneously with providing fresh water supply channel "Eurasia" mark in the surface over which all parts does not exceed land surface markers pritrassovyh
机译:1.一种为预计的航道可航行的航道“欧亚大陆”流动淡水创造条件的方法,包括使用部分长度的Kuma-Manychskaya空心航道追踪黑海地区与里海盆地之间的分界线以及部分Proletarsky库水在其凹处之后的特征在于,返回通道进入重置通道,从大量粘土和沙质水中的高加索人和热运者的斜坡流出的大量径流量,补给和东南分支通道“欧亚大陆”从Summing Volgogradsky水库运送淡水,用于人工河床“ Volga-Don-2”,从而创造了防止主流“欧亚大陆”沉积物堆积的条件。 ! 2.根据权利要求1所述的方法,其特征在于,将利用流经奇索卡西亚(Ciscaucasia)领土的河流的总流量来创建“ Eurasia”伏尔加河补给水条件,以满足人口和工业的需求。淡水以及灌溉和土地灌溉的企业。 ! 3.根据权利要求1所述的方法,其特征在于,通过安排通过床从储层中除去多余的水,将建立条件以防止里海的水位进一步升高。大海由于伏尔加河水含量增加。 ! 4.根据权利要求1所述的方法,其特征在于,与在其所有部分不超过陆地表面标记pritrassovyh的表面上提供淡水供应通道“欧亚大陆”标记同时进行。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号