首页> 外国专利> Permanent formwork for realization of poured concrete staircase in swimming pool, has primary walls secured to secondary walls to brace and maintain primary walls in vertical position for forming compartments filled with poured concrete

Permanent formwork for realization of poured concrete staircase in swimming pool, has primary walls secured to secondary walls to brace and maintain primary walls in vertical position for forming compartments filled with poured concrete

机译:用于在游泳池中实现混凝土浇筑楼梯的永久模板,其主墙固定至次要墙以支撑并保持主墙处于垂直位置,以形成填充有混凝土浇筑的隔间

摘要

The formwork (2) has primary walls (3) arranged vertically along parallel planes, and extending between fixed barriers (10, 11) of a swimming pool (1). Secondary walls (4) are interlaced with the primary walls, where the primary walls are secured to the secondary walls to brace and maintain the primary walls in vertical position and without spill over into a space that extends above top edges for forming compartments filled with poured concrete. The walls are made of polypropylene, polyethylene or PVC materials.
机译:模板(2)具有主壁(3),该主壁(3)沿平行平面垂直布置,并在游泳池(1)的固定屏障(10、11)之间延伸。次要壁(4)与主要壁交织在一起,其中主要壁固定到次要壁上,以支撑和保持主要壁在垂直位置,而不会溢出到延伸到顶部边缘上方的空间中,以形成填充有倾倒物的隔室具体。壁由聚丙烯,聚乙烯或PVC材料制成。

著录项

  • 公开/公告号FR2935412A1

    专利类型

  • 公开/公告日2010-03-05

    原文格式PDF

  • 申请/专利权人 DSN DESIGN SERVICE NETWORK;

    申请/专利号FR20080055927

  • 发明设计人 BOISSEAU JEAN LOUIS;

    申请日2008-09-04

  • 分类号E04F11/02;E04G13/06;E04H4/14;

  • 国家 FR

  • 入库时间 2022-08-21 18:26:45

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号