PLACEMENT PLANNING METHOD FOR METHOD OF PLACING ON CONSOLIDATED FRESH CONCRETE, AND PLACEMENT PLANNING SUPPORT PROGRAM

机译:固结新鲜混凝土的放置方法的放置计划方法及放置计划支持程序

摘要

PROBLEM TO BE SOLVED: To provide a placement planning method of simulating rearrangement and comparing time obtained by adding the concrete placing time of a work section to the rearrangement time of pipelines, with the computed time of allowed placing on consolidated fresh concrete to evaluate propriety.;SOLUTION: A method for optimizing the placement time of a method of placing on consolidated fresh concrete includes steps of: selecting a part to be placed from one concrete supply source out of concrete placing locations of a structure, as the work section; assuming a plurality of concrete supply lines extended from the one concrete supply source to communicate with the suitable number of placing spots, and rearranging the pipelines of the supply lines to assemble the concrete supply lines one time each; computing the concrete placing time of the selected work section and the rearrangement time of the second pipeline; and evaluating "properness" when the computed time satisfies an expression ([concrete placing time]+[pipeline rearrangement time]≤[allowed time of placing on consolidated fresh concrete]).;COPYRIGHT: (C)2011,JPO&INPIT
机译:要解决的问题:提供一种布局规划方法,该方法可以模拟重新布置并比较通过将工作段的混凝土布置时间与管道的重新布置时间相加而获得的时间,以及计算出的允许在固结的新鲜混凝土上布置以评估适当性的时间。 ;解决方案:一种优化放置在固结的新鲜混凝土上的方法的放置时间的方法包括以下步骤:从结构的混凝土放置位置中,从一个混凝土供应源中选择要放置的零件作为工作部分;假设从一个混凝土供应源延伸出多条混凝土供应线以与适当数量的放置点连通,并且重新布置供应线的管线以每次组装一次混凝土供应线;计算选定工作区的具体放置时间和第二条管线的重新布置时间;并在计算出的时间满足表达式时评估“属性”([混凝土放置时间] + [管道重排时间]≤ [允许在新鲜混凝土上放置的时间])。;版权:(C)2011,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号