首页> 外国专利> METHOD FOR HORIZONTALLY PULLING AND INSTALLING CONCRETE BLOCK, AND IMPLEMENT FOR HORIZONTALLY PULLING THE CONCRETE BLOCK

METHOD FOR HORIZONTALLY PULLING AND INSTALLING CONCRETE BLOCK, AND IMPLEMENT FOR HORIZONTALLY PULLING THE CONCRETE BLOCK

机译:水平拉拔和安装混凝土块的方法以及水平拉拔混凝土块的实现

摘要

PROBLEM TO BE SOLVED: To integrate concrete and a horizontal pulling implement together after horizontal pulling by maintaining a state in which a plurality of steel balls are evenly dispersed, even when a rail surface is inclined.;SOLUTION: A steel rail 7 equipped with the upward rail surface 10 is laid on foundation concrete 2; a plurality of spherical magnets 11 are arranged in a dispersed manner at mutual intervals on the rail surface 10; and the plurality of steel balls 13 are placed as a single layer on the rail surface 10, and arranged in the dispersed manner by being magnetically attracted by each of the plurality of spherical magnets 11. A concrete block 15 is placed on the steel balls 13 via a sliding steel plate 17; the concrete block 15 is horizontally pulled to an installation position together with the sliding steel plate 17 while the steel balls 13 roll between the rail surface 10 and the sliding steel plate 17; and the concrete is poured between a lower portion of the concrete block 15 and the foundation concrete 2, so that the concrete block 15 can be installed.;COPYRIGHT: (C)2011,JPO&INPIT
机译:解决的问题:即使在轨道表面倾斜的情况下,通过保持多个钢球均匀分散的状态,在水平拉动后将混凝土和水平拉动工具整合在一起;解决方案:钢轨7配备有向上的轨道表面10铺设在基础混凝土2上。在轨道表面10上以相互隔开的间隔分散地配置有多个球形磁铁11。并且,多个钢球13以单层的方式配置在轨道面10上,并被多个球状磁铁11分别吸引而分散地配置。在该钢球13上配置有混凝土块15。通过滑动钢板17;当钢球13在导轨面10和滑动钢板17之间滚动时,混凝土块15与滑动钢板17一起被水平拉至安装位置。并在混凝土块15的下部和基础混凝土2之间倒入混凝土,以便可以安装混凝土块15 。;版权所有:(C)2011,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号