FRAME CONSTRUCTION METHOD OF PIPE CASE AND FRAME STRUCTURE OF PIPE CASE
FRAME CONSTRUCTION METHOD OF PIPE CASE AND FRAME STRUCTURE OF PIPE CASE
展开▼
机译:管壳的框架构造方法及管壳的框架结构
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a frame construction method of a pipe case which enables an equipment contractor to perform construction in one operation after all of the interior construction of a toilet booth by a builder has been completed.;SOLUTION: The frame construction method is used for installing pipe cases 1A, 1B in the toilet booths 8, 8. A front frame 10 is transported into the toilet booth 8, and is turned. The diagonal dimension of the front frame 10 is smaller than the dimension between the inner surfaces of the right-and-left side walls 8b, 8b of the toilet booth. After the front frame 10 is fixed on the floor surface in the toilet booth 8 in a state where its longitudinal direction is directed to the right and left, a top surface frame 11 which is a separate object is attached between the top end of the front frame 10 and a wall fixation member 12 fixed on the inner wall 8a of the toilet booth. Thus, the pipe cases 1A, 1B are formed by the front frame 10 and the top surface frame 11.;COPYRIGHT: (C)2011,JPO&INPIT
展开▼