Widened portion construction method of the shield machine and shield tunnel

机译:盾构机加宽段施工方法及盾构隧道

摘要

PROBLEM TO BE SOLVED: To remove mud and earth of muddy water including excavation earth, while excavating a wide cavity part by a copy cutter.;SOLUTION: This shield machine has a cutter 5 in front of a body, and has the copy cutter 6 projectable from a peripheral surface of this cutter 5, and has a movable cutoff wall 21 capable of longitudinally cutting off the wide cavity part C by projecting from a body peripheral surface 1 to the wide cavity part C excavated by projecting the copy cutter 6. The wide cavity part C is excavated by the copy cutter 6 while advancing boring by the shield machine in a state of longitudinally cutting off the wide cavity part C in the boring advancing direction of the shield machine by projecting the cutoff wall 21 from the body peripheral surface of this shield machine. At the same time, a lubricant/high pressure water is injected into the wide cavity part C from a front face from the cutoff wall 21, and the lubricant/high pressure water is also injected into the wide cavity part C from the body peripheral surface 1. Just after the cutoff wall 21, a filler is injected into the wide cavity part C from the body peripheral surface 1.;COPYRIGHT: (C)2007,JPO&INPIT
机译:解决的问题:在用仿形切割机挖掘宽腔部分的同时,清除包括开挖土在内的泥土和泥泞的水;解决方案:该屏蔽机在机体前部装有切割器5,并具有仿形切割器6从该切割器5的外周表面可伸出,并具有可移动的截止壁21,该可移动的截止壁21可通过从主体外周表面1向通过伸出复制切割器6而伸出的宽腔部分C突出而纵向切割宽腔部分C。宽腔部C由复制刀具6开挖,同时通过使遮蔽壁21从主体周表面突出而在遮蔽机的镗入前进方向上纵向切开宽腔部C,从而通过屏蔽机进行镗入。这台盾构机同时,从截止壁21的前面将润滑剂/高压水注入到宽腔部分C中,并且还将润滑剂/高压水从身体外围表面注入到宽腔部分C中。 1.在隔断壁21之后,从机体周缘表面1向宽腔部分C中注入填充剂;版权所有:(C)2007,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号