首页> 外国专利> The melting metal make is done the melting metal which has the entry chute of the sub- raw materials which possess the opening and closing type

The melting metal make is done the melting metal which has the entry chute of the sub- raw materials which possess the opening and closing type

机译:进行熔融金属制造,该熔融金属具有具有打开和关闭类型的副原料的入口斜槽

摘要

PROBLEM TO BE SOLVED: To provide a method for preventing a gas from leaking from a chute for charging an auxiliary material in a molten metal smelting furnace so that CO can not be detected in the vicinity of a bunker arranged above the furnace, and to provide an apparatus for preventing the gas leakage.;SOLUTION: When smelting a molten metal by using the molten metal smelting furnace provided with the chute for charging the auxiliary material, which is arranged adjacent to a hood covering a furnace opening so as to collect an exhaust gas, and has an opening/closing gate for preventing back fire, this method for preventing the gas leakage comprises the steps of: toppling the molten metal smelting furnace over in an empty state before operation or moving it to another place; and passing water into the inside of the charging chute from an upstream of a position at which the opening/closing gate of the charging chute is installed to clean and remove a deposit. As a result, CO has not been detected in the vicinity of the bunker arranged above the furnace.;COPYRIGHT: (C)2007,JPO&INPIT
机译:解决的问题:提供一种防止气体从用于将辅助材料填充到熔融金属熔炼炉中的溜槽泄漏的方法,从而在设置于该炉上方的料仓附近无法检测到CO。解决方案:解决方案:在使用熔融金属熔炼炉熔炼熔融金属时,该熔炼炉配备有用于装入辅助材料的斜槽,该熔炉与覆盖炉口的烟罩相邻设置,以收集废气气体,并且具有用于防止回火的开/关门,该防止气体泄漏的方法包括以下步骤:在操作之前将熔融金属熔炼炉倾倒成空状态,或者将其移动到另一个地方;从安装斜槽的开/关门的位置的上游将水送入斜槽的内部,以清除并去除沉积物。结果,在炉子上方的料仓附近未检测到CO。版权所有:(C)2007,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号