首页>
外国专利>
Additional strength construction method null top and bottom direction around the punch station after the construction, of the single arrangement of bar
Additional strength construction method null top and bottom direction around the punch station after the construction, of the single arrangement of bar
展开▼
机译:钢筋单独布置后,在冲孔工位周围的顶部和底部方向无效的附加强度构造方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a reinforcing method capable of making the reinforcement enabling bending strength and shear strength equal to, or more than, a foundation without having any penetrating hole or exceeded to produce even if an opening is afterwards made in a single arrangement RC foundation to keep a space for letting piping and wiring pass in the opening.;SOLUTION: The penetrating hole 2 is perforated in the single arrangement existing RC foundation 1 for the low-rise housing reinforced by a main bar 6 extended in the longitudinal direction while locating in one vertical plane at an interval in the vertical direction and a vertical bar 7 placed at an interval in the longitudinal direction for connecting the main bar. An opening circumference of the penetrating hole 2 is surrounded by an additional reinforcing bar 4 inclined at 45 degrees to the horizontal, a polymer cement mortar 5 is applied to a foundation rise surface 3 so that the reinforcing bar can not be exposed. Construction work can be very easily finished within a short period of time, and cost reduction of work can be promoted.;COPYRIGHT: (C)2006,JPO&NCIPI
展开▼