首页> 外国专利> Steel pipe sheet pile, joint structure of steel pipe sheet pile, and wall structure as well as the pull-out method of steel pipe sheet pile

Steel pipe sheet pile, joint structure of steel pipe sheet pile, and wall structure as well as the pull-out method of steel pipe sheet pile

机译:钢管板桩,钢管板桩的接头结构,壁结构以及钢管板桩的拔出方法

摘要

As for the steel pipe sheet pile of this invention, on the outside of the lagging itself and the aforementioned lagging itself which consist of the metal tubing, paralleling to the longitudinal direction of the aforementioned lagging, itself on opposite side to the 1st coupling and the aforementioned external aforementioned 1st coupling of the aforementioned lagging itself which are provided, paralleling to the longitudinal direction of the aforementioned lagging, itself the 2nd coupling which is provided and, to have, the aforementioned 1st and 2nd coupling to be laid out respectively alienating from the aforementioned 1st section on rear side of the 1st section and the aforementioned lagging itself which are laid out on front side of the coupling itself and the aforementioned lagging itself, aforementioned 1stWith the section to possess with the 2nd section which supports the aforementioned coupling itself, the aforementioned 1st and 2nd section respectively to be locked by the aforementioned lagging, itself in the aforementioned 1st coupling, paralleling to the longitudinal direction of the aforementioned lagging and itself be able to provide the 1st space where one end of the extending being present and the same longitudinal direction is blocked, in the aforementioned 2nd coupling, paralleling to the longitudinal direction of the aforementioned lagging and itself be able to provide the 2nd space where one end of the extending being present and the same longitudinal direction is blocked, the aforementioned 1st and 2nd section of the aforementioned 1st coupling block the aforementioned 1st space,And in the aforementioned 1st and 2nd section of the aforementioned 2nd coupling block the aforementioned 2nd space, from the aforementioned 1st and 2nd space directing to outside direction, the 1st injection hole in order to inject the compressed water is provided.
机译:本发明的钢管板桩,在由金属管构成的,与上述包壳的长度方向平行的,由金属制成的套圈自身和上述套圈自身的外侧,与第一联轴器和第一联轴器相反。所提供的上述迟滞的自身的上述外部的上述第一联接件,平行于上述迟滞的纵向的方向,本身是所提供的第二联接件,并且上述第一和第二联接件分别布置成与在第一部分的后侧上的前述第一部分和在上述联轴器自身的前面上布置的上述滞后件和上述滞后件,上述第一具有与支撑上述联轴器本身的第二部分的部分。前述的第一和第二部分分别被前述的锁定在上述第二联轴器中,在上述第一联轴器中,上述联轴器本身与上述联轴器的长度方向平行,并且能够提供第一空间,在该第一空间中,延伸的一端存在且同一纵向被堵塞。平行于前述包胶的纵向方向并且自身能够提供第二空间,该第二空间中存在延伸的一端并且相同的纵向方向被阻塞,上述第一联接器的前述第一和第二部分阻塞前述第一空间。并且,在上述第二连结块的上述第一部分和第二部分中的上述第二空间中,从朝向外侧的上述第一空间和第二空间设置有用于注入压缩水的第一注入孔。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号