首页>
外国专利>
Apparatus and Method for Replacing a Bridge Using a Pre-Cast Construction Techniques
Apparatus and Method for Replacing a Bridge Using a Pre-Cast Construction Techniques
展开▼
机译:使用预浇筑施工技术更换桥梁的设备和方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method and apparatus for replacing a bridge using pre-cast materials, including steel piles, steel reinforced concrete caps, and metallic male and female connectors. The pre-cast materials can be formed to precise standards in a controlled factory environment before being brought to the worksite for the bridge replacement project. Further, the male and female connectors provide for a quick and robust way to connect the caps to the piles without the use of welding between the piles and the caps.
展开▼