Where pipes are installed on the mineral bed, the internal reinforcement of the irrigation line can be carried out for partial or continuous layer-by-layer irrigation. This line-pipe combination is installed on the SEG. Battery properties.
Where pipes are installed on the mineral bed, the internal reinforcement of the irrigation line can be carried out for partial or continuous layer-by-layer irrigation. This line-pipe combination is installed on the SEG. Battery properties.
Internal technified Irrigation method in Leach which includes the installation of Pipes inside the bed of oreThe Internal lines which allow the irrigation to wet and then Perform a partial or continuous irrigation for layersThis combination of Line Pipe installed according to Properties of the stack.