首页> 外国专利> CONSTRUCTION FOR AN OFFSHORE WIND ENERGY PLANT WITH AT LEAST ONE SEA CABLE IMPLEMENTATION

CONSTRUCTION FOR AN OFFSHORE WIND ENERGY PLANT WITH AT LEAST ONE SEA CABLE IMPLEMENTATION

机译:至少有一个海缆实施的海上风能工厂建设

摘要

The foundation has a sea cable feed through, which is provided at a height within a range of 3.5 meters to 5 meters over a sea bed (20). The sea cable feed through is designed for guiding sea cables (24) under an angle of forty degrees to the foundation from a side of the sea bed diagonally upwards. An oval or oval shaped wall breakthrough (12) is provided leading through the cables, where a round pipe is fastened in the wall breakthrough, and the pipe consists of cast iron.
机译:该基础具有海缆馈线,该海缆馈线设置在海床(20)上方3.5米至5米范围内的高度上。海缆穿通线被设计成以四十度角从海床的一侧对角向上引导海缆(24)。提供了穿过电缆的椭圆形或椭圆形壁穿墙口(12),其中圆形管固定在壁穿墙口中,并且该管由铸铁组成。

著录项

  • 公开/公告号AT513988T

    专利类型

  • 公开/公告日2011-07-15

    原文格式PDF

  • 申请/专利权人 BARD HOLDING GMBH;

    申请/专利号AT20070008467T

  • 发明设计人 BEKKER ARNGOLT;

    申请日2007-04-26

  • 分类号F03D1;B63B21;E02B17;F03D11;F03D11/04;H02G1/10;

  • 国家 AT

  • 入库时间 2022-08-21 18:03:13

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号