首页>
外国专利>
Procedure for transport, manipulation, positioning and fixing of prefabricated construction elements for forming floor to ceiling walls or internal partitions resistant fire in all kinds of constructions, including shipbuilding.
Procedure for transport, manipulation, positioning and fixing of prefabricated construction elements for forming floor to ceiling walls or internal partitions resistant fire in all kinds of constructions, including shipbuilding.
Process for shipping, handling, positioning and fixing of prefabricated construction elements floor to ceiling to form walls or resistant interior walls to fire all kinds of buildings, including shipbuilding, comprising the transfer and positioning of each panel (10) by transfer truck (1), optionally equipped, for boards (10) of more than 50 kilos, crane (3) extensible and rotating the subject; placing a pin (11) fixed to the ceiling and a sleeve (13) with internal thread, and on the ground (S), a socket (12), concrete, fixed by screws (18); incorporating, at the upper edge of the board (10) a metal clamp (20) of inverted U section, which fits to the sleeve (13) and filling concrete the space (14) between the panel (10) and the roof .
展开▼