PURPOSE: a kind of that the retaining wall structure to prevent Deco corridor to be mounted on a cutting part being set from by soil pressure for Deco corridor seashore road. ;CONSTITUTION: the beachfront highway of the Deco corridor of building is as follows. Cut portion, by being formed in the retaining wall structure (12) of side in road (11). A kind of hole of lithotome (21) is mounted. Cutting portion steel frame is formed in a kind of front surface of front corridor part (20), filling is gathered materials and soil, is mounted on rear natural stone. The rear surface of corridor part before passage portion (30) and steel mesh are mounted on afterwards;The 2011 of copyright KIPO submissions
展开▼