首页> 外国专利> BRIDGE CONSTRUCTION METHOD USING HYBRID PSC GIRDER

BRIDGE CONSTRUCTION METHOD USING HYBRID PSC GIRDER

机译:混合PSC梁的桥梁施工方法

摘要

PURPOSE: A method of constructing a bridge using a hybrid PSC(Pre-stressed Concrete Beam) girder is provided to reduce the weight of the upper and lower structures of a bridge since the horizontal gap of the PSC girder is widely arranged. CONSTITUTION: A method of constructing a bridge using a hybrid PSC girder comprises next steps. A transverse beam(200) is installed between the PSC girder and its side in a transverse direction. A plurality of transverse beams are installed to be separated in a longitudinal direction. A transverse secondary beam(100) is installed between the transverse beams in parallel to the PSC girder(10) in a longitudinal direction. A transverse point(A) is formed on the bottom of a slab by the transverse secondary beam. The slab is formed to make contact with the tops of the PSC girder, the transverse beam, and the transverse secondary beam.
机译:目的:提供一种使用混合PSC(预应力混凝土梁)梁的桥梁建造方法,以减轻桥梁上下结构的重量,因为PSC梁的水平间隙较宽。构成:一种使用混合PSC大梁建造桥梁的方法,包括以下步骤。横梁(200)安装在PSC梁与其横向之间。多个横向梁被安装成在纵向方向上分开。横向副梁(100)在纵向上平行于PSC梁(10)安装在横向梁之间。横向第二光束在平板的底部形成横向点(A)。平板形成为与PSC大梁的顶部,横向梁和横向次梁接触。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号