TOP-DOWN CONSTRUCTION METHOD FOR UNDERGROUND STRUCTURE WITH SLURRY WALL RETAINED BY SLAB DIAPHRAGM EFFECT
TOP-DOWN CONSTRUCTION METHOD FOR UNDERGROUND STRUCTURE WITH SLURRY WALL RETAINED BY SLAB DIAPHRAGM EFFECT
展开▼
机译:平板横隔板效应保留淤泥墙的地下结构的逆作法。
展开▼
页面导航
摘要
著录项
相似文献
摘要
A top-down construction method for an underground structure with slurry walls is provided to support the gravity load by steel frame girders and the earth pressure by slabs in the simplified joining between the girders and slurry walls. A top-down construction method for an underground structure with slurry walls include the steps of building slurry walls(100) underground by casting concrete into a trench, forming base parts at lower ends of steel frame columns, forming spaces for securing steel frame beams(240) in the slurry walls, mounting the ends of the steel frame beams to positions in the slurry walls from which fillers are removed, and casting slab concrete on the steel frame beams.