摘要

The present invention takes structural stability by filling the high pressure grout material between the sheet pile and the excavation front part in consideration of structural weakness when there is a gravel layer on the top of the rock layer, and can significantly shorten the air by using the high pressure grout material. To provide a grout-type composite steel sheet pile and a construction method thereof, which not only saves the time required for forming the order pile of the sheet pile and the rock surface, but also increases the structural stability by constructing the temporary facility after the formation of the structure. There is a purpose. Grout-type synthetic steel sheet piles according to the present invention for achieving the above object is entered into the rock bed, H piles arranged at regular intervals; A wall formed by entering a sheet pile so as to be located at one side of the H pile; An order wall on which the grout material is poured between the H pile and the sheet pile; Characterized in that consisting of a band installed in the horizontal direction of the inner side of the H-pile. In addition, the grout-type composite steel sheet pile construction method according to the present invention for achieving the above object comprises the steps of forming a plurality of holes by drilling the soil layer and rock layer; Injecting an H pile into a rock layer in the drilling hole; Forming a wall by accessing the sheet pile to the rock layer so as to be located at one side of the H pile; Forming a plurality of grout holes by drilling the soil layer and the rock layer at a portion spaced apart from the drilling hole by a predetermined distance; Filling and curing the grout material into the grout hole to form a water order wall; Characterized in that the step consisting of installing the strip in the horizontal direction of the inner side of the H-pile.
机译:考虑到结构性弱,当在岩石层的顶部上有砾石层时,本发明通过在板桩和开挖前部之间填充高压灌浆材料而获得结构稳定性,并且通过使用这种结构可以显着缩短空气。高压灌浆材料。本发明提供一种灌浆型复合钢板桩及其施工方法,不仅节省了形成钢板桩的顺序桩和岩石面所需的时间,而且通过在施工后建造临时设施而增加了结构稳定性。结构的形成。有一个目的。为了实现上述目的,将根据本发明的水泥浆式合成钢板桩插入到岩床中,将H桩等间隔地配置。通过进入板桩而形成的壁,该壁位于H桩的一侧;在H桩和板桩之间倒入灌浆材料的命令墙;其特征在于,由在H形桩的内侧的水平方向上安装的带构成。另外,用于实现上述目的的本发明的灌浆型复合钢板桩的施工方法包括以下步骤:通过在土壤层和岩石层上钻孔而形成多个孔。将H桩注入钻孔的岩层中;通过使板桩进入岩层以形成墙,使其位于H桩的一侧;通过在与钻孔相距预定距离的部分上钻孔土壤层和岩石层而形成多个灌浆孔;将灌浆材料填充并固化到灌浆孔中,以形成注水墙;其特征在于,该步骤包括在H形桩内侧的水平方向上安装条带。

著录项

  • 公开/公告号KR101070372B1

    专利类型

  • 公开/公告日2011-10-05

    原文格式PDF

  • 申请/专利权人 CHANG IN JOON;

    申请/专利号KR20100111440

  • 发明设计人 CHANG IN JOON;

    申请日2010-11-10

  • 分类号E02D5/04;E02D5/06;C09K17/10;

  • 国家 KR

  • 入库时间 2022-08-21 17:49:44

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号