首页> 外国专利> METHOD FOR CARRYING OUT AND FIXING OF MINE WORKINGS IN SEVERE MINING AND GEOLOGICAL CONDITIONS

METHOD FOR CARRYING OUT AND FIXING OF MINE WORKINGS IN SEVERE MINING AND GEOLOGICAL CONDITIONS

机译:在严重采矿和地质条件下进行和固定矿井工作的方法

摘要

FIELD: mining.;SUBSTANCE: method for carrying out and fixing of mine workings in severe mining and geological conditions involves formation of unloading cavity in front of working face with non-reducible advance and installation of constant support. Two rows of pneumatic bottles with shield are supplied to unloading cavity, compressed air is supplied to pneumatic bottles and shield is lifted to the roof beam level of constant support. After that, shield is laid on constant support frame and the space is created between cavity roof and pneumatic bottles by supplying compressed air to pneumatic bottles. Then, rock is excavated under shield for the pitch of installation of constant support frames, and the first row of pneumatic bottles is unloaded and extracted to fixed part of mine working; after that, constant support frame is installed under shield and space is removed from pneumatic bottles of the second row by releasing compressed air. Pneumatic bottles are removed to fixed part of mine working; then, unloading cavity is made to original depth; after that, operations are repeated.;EFFECT: increasing efficiency and safety of carrying out and fixing of development workings.;5 dwg
机译:领域:采矿:物质:在严峻的采矿和地质条件下进行和固定矿山作业的方法包括在工作面前形成不可减少的推进力的卸载腔并安装恒定的支撑。两排带护罩的气动瓶被供应到卸料腔,压缩空气被提供给气动瓶,护罩被提升到恒定支撑的顶梁水平。之后,将屏蔽层放置在恒定的支撑框架上,并通过向气动瓶供应压缩空气在空腔顶板和气动瓶之间创建空间。然后,在盾构下开挖岩石,以固定安装支架的间距,然后将第一排气瓶卸货并抽出到矿山作业的固定部分。之后,将恒定的支撑框架安装在护罩下,并通过释放压缩空气从第二排的气压瓶中去除空间。将气瓶移至矿山作业的固定部分;然后,将卸料腔制成原始深度。之后,重复操作。效果:提高执行和固定开发工作的效率和安全性。5dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号